This week we installed two new screens at our customer’s site.

The first location is the reception area, the customer has floor-to-ceiling windows on either side of the old 65” plasma screens position. The old screen was removed, and we installed a 75” Philips display which is designed for bright locations in its place.  

The second screen installation is in an office, we installed a 50” screen to the wall and installed mini trunking for the cables from the position of the screen to the desk.  

Contact us to schedule a demo of our audiovisual services and experience the difference for yourself.

Leave a Comment

Your email address will not be published. Required fields are marked *